![]() ![]() The Block III was redesignated as AH-64E in 2012. The first helicopter under the contract was delivered in October 2011. The contract called for the production of 51 AH-64D Apache Block III helicopters for the US Army. The US Army awarded a $247m contract to Boeing in October 2010 to start low-rate initial production (LRIP) of the AH-64D Apache Block III helicopter. The first new-build AH-64D was delivered to the US Army in June 2007 and the first of the additional remanufactured helicopters in October 2007. The US Army ordered 96 additional remanufactured helicopters in January 2007 and 18 new-build helicopters in April 2007.ĭuring the same year, 30 AH-64Ds were ordered by the UAE. Boeing upgraded the 501 AH-64A Apaches to AH-64D standard and completed the deliveries in August 2006.Īn additional 13 new-build Apaches were initially ordered, along with another 11 in November 2006. The AH-64D Longbow is fitted with the Longbow millimetre wave fire control radar and the Longbow Hellfire missile. It was deployed by the US Army in Afghanistan as part of Operation Anaconda in support of Operation Iraqi Freedom and, from June 2003, in South Korea. The first Apache AH-64D Longbow was delivered in April 1997 to the US Army. The aircraft was used in Operation Desert Storm and supported low intensity and peacekeeping operations worldwide, including in Turkey, Bosnia and Kosovo. It was first used in combat in 1989 in the US military action in Panama. The helicopter completed five million flight hours, including 1.3 million in combat operations, as of March 2023.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |